Event Details
Indianapolis, IN
Hotel information not available
April 26, 2011 — April 28, 2011
Welcome begins at 8:00 a.m.
Agenda
All technical presentations are available as PDFs to download from within the agenda.
Day 1 | Tuesday, April 26, 2011
Theme: Accelerated Construction
Time | Event Details |
---|---|
8:00 a.m. | Welcome |
8:10 a.m. | Introductions to NCC Meeting |
8:30 a.m. | MEPDG Design Considerations for Accelerated Construction (PDF) |
9:15 a.m. | Construction Under Accelerated Conditions Iowa's Experience with Fast Track Concrete – Where it All Began! (PDF) Maturity in Iowa: A Construction Perspective (PDF) |
10:00 a.m. | Morning Break (30 min.) |
10:30 a.m. | Mix Considerations for Accelerated Construction (PDF) |
11:15 a.m. | Equipment Grinders and Mills (PDF) |
12:00 p.m. | Lunch (45 min.) |
12:45 p.m. | Case Studies in Accelerated Construction: The IH 10/ Katy Freeway Reconstruction Houston, Texas (PDF) DFW Connector Accelerated Pavement Construction Challenges and Solutions (PDF) Utilization of Waste Streams for High Performance Cements (PDF) |
2:15 p.m. | Research Updates: Mix Design and Analysis Track Pooled Fund TAC Meeting TPF 5(205) (PDF) Pavement Joint Deterioration (PDF) Joint Deterioration (PDF) Salt-Concrete Interaction as it Relates to Premature Pavement Joint Deterioration (PDF) Current Research on Air-Entrained Concrete (PDF) |
3:00 p.m. | Afternoon Break |
3:15 p.m. | Air System Requirements: What Air Content Do We Need in Modern Concrete Paving Mixtures? (PDF) Concrete Pavement Surface Characteristics Program (PDF) Measuring the Effectiveness of Cure Materials (PDF) |
5:00 p.m. | Adjourn |
Day 2 | Wednesday, April 27, 2011
Time | Event Details |
---|---|
8:00 a.m. | Merging TRB Research Needs Statements and TTCC/NCC Research Needs (PDF) |
8:15 a.m. | CP Tech Center National Training Update and Tech Transfer Products (PDF) |
8:30 a.m. | NC2 Pre-Business Meeting Discussion Items |
9:00 a.m. | Discussion of Concept for National Laboratory Concrete Materials Technology Research and Implementation Program (PDF) |
9:30 a.m. | Morning Break (30 min.) |
10:00 a.m. | Ensuring Quality in the Concrete Paving Process (PDF) Overview of FHWA's QA/QC Program for Concrete Pavements (PDF) |
12:00 p.m. | Lunch Briefing on Indiana I70/465 Project – 45 min. (PDF) |
12:45 p.m. | Board buses for field tour of I70/465 Project and Purdue Laboratory
|
6:00 p.m. | Group Dinner |
7:00 p.m | Board buses and return to hotel |
Day 3 | Thursday, April 28, 2011
Business Meeting
Time | Event Details |
---|---|
7:45 a.m. | Election of Officers Extension of TTCC TPF NCC 2011/12 Meeting Schedule/Host States Changes to AASHTO M 254 and T 253 Based on Dowel Report (PDF) |
8:45 a.m. | State Reports on QC/QA Requirements for Pavements
|
10:00 a.m. | Morning Break (15 min.) |
11:45 a.m. | NCC Adjourns |
12:00 p.m. – 5:00 p.m. | Lunch and TAC Meeting for TPF 5(179) – Permeability Tests Group |