Event Details
Salt Lake City, UT
The Little America Hotel
500 South Main Street
Salt Lake City, UT 84101
801-596-5700
April 25, 2017 — April 27, 2017
TTCC Pooled Fund States Meeting
Begins at 7:30 a.m.
General Sessions
Breakfast is available at 6:45 a.m.
Registration begins at 7:00 a.m.
Meeting Summary
The 2½-day spring meeting of the National Concrete Consortium (NC2) hosted by the Utah DOT brought together the expertise and experience of 172 attendees from FHWA, 30 DOTs (65 individuals), the Illinois Tollway, academia, and industry in an excellent event focused on improving concrete performance and structural concrete applications. Maria Masten, Concrete Materials Engineer from the Minnesota Department of Transportation, is the current chairperson. The meeting agenda is available below. All technical presentations are available as PDFs to download from within the agenda. A detailed summary of the Spring 2017 meeting is also available to download (PDF).
Agenda
TTCC Pooled Fund States Meeting
Tuesday, April 25, 2017
Time | Event Details |
---|---|
7:30 a.m. | National CP Tech Center Overview (PDF) National CP Tech Center Updates (PDF) |
8:15 a.m. | Dowel Bar Specification Update (PDF) |
8:30 a.m. | Round Robin Topics |
9:30 a.m. | Adjourn Meeting |
Day 1 | Tuesday, September 25, 2017
Time | Event Details |
---|---|
6:45 a.m. – 8:00 a.m. | Breakfast |
7:00 a.m. – 10:00 a.m. | Registration – please check in at the registration table |
7:30 a.m. – 9:30 a.m. | DOTs Breakfast Meeting |
9:30 a.m. | Morning Break |
10:00 a.m. | General Session Welcome |
10:15 a.m. | Looking Back on 20 Years of MC2/NC2 (PDF) Where it All Began (PDF) Kansas K-96 High Performance Concrete Pavement – 20 Years Later (PDF)
|
11:30 a.m. | FHWA Updates: FHWA's Sustainable Pavement Program (PDF) FHWA Mobile Concrete Lab (PDF) |
11:45 a.m. | CP Tech Updates (PDF) |
12:00 p.m. | Lunch |
1:00 p.m. | State Reports Summary: Bridge Deck Overlays/Approaches (PDF) State Survey Responses – Part 1 (PDF) State Survey Responses – Part 2 (PDF) |
1:45 p.m. | State Presentations: Precast Concrete Pavements Update (PDF) Polyester Concrete (PDF) Indiana Research on Early Opening to Traffic of Pavement Patches (PDF) |
3:00 p.m. | Afternoon Break |
3:30 p.m. | State Presentations (continued) Illinois Early-Age Response to Fatigue Loading (PDF) Concrete Shrinkageand Its Relationship to Internal Curing (PDF) |
4:30 p.m. | NRRA Update (PDF) |
4:45 p.m. | Q&A and Open Discussion |
5:00 p.m. | Adjourn for the day |
Day 2 | Wednesday, April 26, 2017
Time | Event Details |
---|---|
6:45 a.m. – 8:00 a.m. | Breakfast |
8:00 a.m. | RC Future: Results from LTRC's Accelerated Loading Facility (PDF) |
8:30 a.m. | Laboratory and Fatigue Evaluation of Continuously Fiver Reinforced Concrete Pavement (PDF) |
9:00 a.m. | Today's Fly Ash With a Look Toward Tomorrow's Fly Ash (PDF) |
9:30 a.m. | Morning Break |
10:00 a.m. | ASR: Harmonization with ASTM (PDF) Emerging VCMD (Aggregate) and ACCT (Concrete) Test Methods for Formulating Performance Based ASR-Resistant Concrete Mixes (PDF) TX ASR Exposure Sites Update (PDF) State Experience Implementing PP65: Pennsylvania DOT (PDF) Nebraska DOR (PDF) |
11:45 a.m. | Q&A and Open Discussion |
12:00 p.m. | Lunch |
1:00 p.m. | Business Meeting and Elections (PDF) Business Meeting Notes (PDF) |
1:30 p.m. | Quick Updates: Dowel Bar Task Force (PDF) HIPERPAVE (PDF) |
2:00 p.m. | Technical Tour Presentation (PDF) Project Pictures (PDF) |
2:30 p.m. | Afternoon Break |
3:00 p.m. | Performance Engineered Mixes (PEM): FHWA Perspective (PDF) AASHTO PP84 (PDF) PEM TPF Solicitation Update Q&A |
4:00 p.m. | Shrinkage Testing: Shrinkage Testing and Challenges (PDF) Tests Available – Pro's and Con's (PDF) |
4:45 p.m. | Q&A and Open Discussion |
5:00 p.m. | Adjourn |
6:00 p.m. | Group Dinner |
Day 3 | Thursday, April 27, 2017
Time | Event Details |
---|---|
6:45 a.m. – 8:00 a.m. | Breakfast |
8:00 a.m. | Buses depart for technical tour, Mountain View Corridor |
12:00 p.m. | Buses drop off, one at the airport and one at the Little America Hotel |