CLOSE OVERLAY

InTrans / Aug 14, 2018

Load Test of Wood Bridge

This report concerns recent field testing witnessed by our firm at the St Regis Paper Company plant in Cass Lake, Minnesota. A 26′ span Wheeler Panel-lam Bridge System was constructed at the Cass Lake Plant and various axle loadings were applied to the deck.

TOP