InTrans / Aug 14, 2018
Performance Monitoring of a GRS/Timber Bridge
To design, construct, monitor, and evaluate a glulam girder bridge superstructure used in conjunction with a GRS-IBS. The primary objective of this study is to design and build a bridge system which will be instrumented to record several performance parameters used to evaluate and understand the behavior of all parts of the GRS-IBS and bridge superstructure (deck superstructure, approach roadway, abutment back wall, and reinforced soil abutment).