Integral Abutment Details for ABC Projects, Phase II

Project Details
STATUS

In-Progress

PROJECT NUMBER

18-SPR-013

START DATE

08/21/17

END DATE

02/28/19

FOCUS AREAS

Infrastructure

RESEARCH CENTERS InTrans, BEC, NCWTS
SPONSORS

ABC-UTC
Iowa Department of Transportation

Researchers
Principal Investigator
Travis Hosteng

Co-Director, NCWTS

Co-Principal Investigator
Behrouz Shafei

Faculty Affiliate

About the research

Nationally, a significant amount of effort has been invested into accelerate bridge construction (ABC) methods, designs, and projects. At the same time, development and integration of ultra-high performance concrete (UHPC) into bridge projects has increased as well; often times the use of ABC and UHPC being interdependent on one another. To date, integral abutments designs are seeing increased use though they are one design feature yet to be realized in the lateral slide sector of ABC.  Development and testing of means and methods to construct bridges in an accelerated time frame, and, incorporating integral abutments and all their inherent benefits would greatly benefit the bridge community. The focus of this research is to develop an integral abutment detail that facilitates lateral slide construction methods and utilize UHPC for the connection. A full-scale specimen will be designed, constructed in the laboratory, and tested to service level loads for evaluation.

TOP