Performance Centered Concrete Construction (P3C)

Project Details
STATUS

In-Progress

PROJECT NUMBER

24-903, TPF-5(517)

START DATE

08/01/24

END DATE

12/31/25

FOCUS AREAS

Infrastructure

RESEARCH CENTERS InTrans, CP Tech Center
SPONSORS

Iowa Department of Transportation

Researchers
Principal Investigator
Peter Taylor

Director, CP Tech Center

Co-Principal Investigator
Dan King

Research Engineer, CP Tech Center

About the research

A Performance Centered Concrete Construction initiative will assure that any new concrete pavement or overlay will last for the intended period, with a minimum of distress, at a low life-cycle cost in an increasingly sustainable way. Reducing the need to replace or repair any concrete pavement will provide the direct benefits of saving money, decreasing CO2 footprint, and easing traffic delays – all of which are beneficial to sustainability. Fewer closures over the life of the pavement also enhances the safety of the traveling public and road workers.

TOP