CLOSE OVERLAY

Construction of New Substructure Beneath Existing Bridges

Project Details
STATUS

In-Progress

START DATE

01/01/17

END DATE

02/28/19

FOCUS AREAS

Infrastructure

RESEARCH CENTERS InTrans, BEC
SPONSORS

Iowa Department of Transportation
Iowa Highway Research Board

Researchers
Principal Investigator
Ping Lu

Associate Director, Bridge Engineering Center

Co-Principal Investigator
Brent Phares

Bridge Research Engineer, BEC

Co-Principal Investigator
Yaohua "Jimmy" Deng

Research Engineer

About the research

The objectives of this project include three main focus areas:

  1. Documenting, through a literature search and survey, methods (including but not limited to multi-splicing and micro-piles) for constructing new substructures beneath existing bridges.
  2. Evaluating proven methods in terms of design considerations, constructability, and cost.
  3. Documenting the project findings and developing method selection recommendations/guidelines.

This research will result in guidelines and specifications that can be readily used by the Iowa DOT bridge designers and construction engineers as well as other bridge owners, consultants, and contractors, such that appropriate and cost effective construction methods can be identified for efficient and effective construction.